1. |
Begin by marking your path using 2 lengths of rope or 2 garden hoses. You should consider the path that you would like to take and consider laying the hoses out straight or in a curved fashion. |
|
|
2. |
Position the stones on the ground so that you can adjust the pattern and distance between stones before digging the holes. Keep in mind that a natural stride is about 18 inches so you will want to place the stones so that each stone is 18 inches from the center of the next. |
|
|
3. |
Leave the stones in place and dig straight down with the trowel or flat spaded shovel to outline each stone in the earth below each. |
|
|
4. |
Then remove the stone and dig out the sod and earth within the outline so that the stone will sit about an inch above the ground once you have poured an inch of sand into the hole. You will need to consider the thickness of each stone in this step. |
|
|
5. |
Pour about an inch of sand into the hole and level the bottom of the hole, so that the stone will lay flat. |
|
|
6. |
Place the stone into the hole. |
|
|
7. |
Use the level to make sure the stone is relatively level. Push on the stone to make sure it does not rock. You can add or remove sand to accommodate for oddly shaped stones at this point. |
|
|
8. |
Once the stone is level, fill in the area around the stone with soil and tamp it firmly. |
|
|
9. |
Make sure that the stones are about the same height by laying a board across a few stones and using the level. |
|
|
10. |
Once you have completed the walk sweep each stone so that each is clean. |
|
|
11. |
Over time you will find that the stones will settle. You can adjust the height or the level of the stones by simply lifting the stone and filling in the hole with some sand or soil. |
|
|